Waste Management

Drill Cuttings Management — Multi-Well Pad Program

Permian Basin, TX
8 months

Client

Major Independent Operator

Project Scope

Full waste management and solids control services across a 12-well pad drilling program in the Permian Basin. PIER9 deployed a complete solids control equipment spread and managed all drill cuttings from point of generation through licensed disposal.

Key Highlights

12-well pad program completed ahead of schedule
100% regulatory compliance throughout campaign
Zero environmental incidents or reportable releases
30% reduction in waste volumes through on-site treatment
Full documentation and EPA reporting delivered
Drilling Fluids

WBM & OBM Fluid Program — Horizontal Well Campaign

Eagle Ford, TX
5 months

Client

Mid-Size E&P Company

Project Scope

Design and delivery of water-based and oil-based mud systems for a 6-well horizontal drilling campaign in the Eagle Ford Shale. PIER9 provided on-site mud engineer support throughout, with real-time fluid monitoring and optimization at each wellsite.

Key Highlights

6 horizontal wells drilled to TD without fluid-related NPT
Custom WBM formulation reduced formation damage
On-site mud engineer support on all wells
Real-time fluid reporting to client drilling team
Full end-of-well fluid disposal and reporting
Waste Management

Solids Control Equipment Supply & Operation

Haynesville, LA
4 months

Client

National Oil Company Subsidiary

Project Scope

Supply, installation, and operation of a full solids control equipment spread for a deep gas drilling program in the Haynesville Shale. PIER9 managed the complete solids control loop including shale shakers, centrifuges, and hydrocyclones.

Key Highlights

Full solids control spread mobilized within 72 hours
Maintained fluid properties within spec throughout program
Reduced mud losses by 22% versus offset wells
Operated across 4 consecutive wells without equipment downtime
All cuttings disposed of in compliance with Louisiana DEQ requirements
Drilling Fluids

Completion Fluid Supply — Workover Campaign

Permian Basin, TX
3 months

Client

Independent Operator

Project Scope

Supply and management of completion and workover fluids for a 10-well intervention campaign. PIER9 engineered brine systems tailored to each well's specific pressure and temperature requirements, with on-call technical support throughout.

Key Highlights

10-well workover campaign completed on schedule
Custom brine systems engineered per well
On-call technical support throughout campaign
Zero formation damage incidents
Full fluid testing and quality control documentation